Skip to content

Free shipping to the US, Canada, Australia and New Zealand. Metal coop signs ship to US addresses only.

0

Cancel or Change an Order

Last updated:

You hit “Place order”, and then it dawns on you: Peony goes above Daisy in the pecking order these days, or the hoodie should have been an XL, or the parcel is heading to your old address. Breathe. You have 24 hours from placing an order to cancel it or change it. This page explains what can be changed, how to ask, what happens once the 24 hours are up, and how quickly your money comes back if you cancel.

Cancelling and changing at a glance

  • Window: within 24 hours of placing the order.
  • How: email support@coopink.shop with your order number and the change.
  • What can change: hens’ names and their order, coop name, layout, size, colour, items, quantity and the shipping address.
  • Cancellation refund: the full amount, refunded within 7 days of the cancellation.
  • After 24 hours: every product can still be returned within 60 days of delivery, with a free return label, and refunded within 7 days of receiving the return.

1. Why the window is 24 hours

Every Coop Ink piece is made for its order. The coop name and the hens’ names go onto the shirt, mug, hat, sign or print exactly as you typed them, and making the order takes 1–3 business days. Once production has started, a typed name cannot be untyped. The 24-hour window gives you a fair stretch of time to read your confirmation email properly, show it to the rest of the household and fix anything that slipped through.

The window is counted from the moment the order is placed, which is the time shown in your order confirmation email. It runs on the clock, not on business days, so an order placed at 9 pm on a Friday can be changed until 9 pm on Saturday.

2. Read your confirmation email first

No proof is emailed, and nothing is sent for approval. We print exactly what was typed. That makes the order confirmation email the best place to catch a mistake. It lists everything you entered. Within a few minutes of ordering, open it and check, slowly:

  • Every hen’s name, letter by letter. “Margiold” and “Marigold” look much the same at a glance.
  • The order of the names. Roster pieces print one name per line, top hen first, in the order you typed them.
  • The coop name. Up to 22 characters, or 14 on a hat. Check spaces and capital letters too.
  • The layout. Every roster piece also has a “Coop name only” layout. Make sure you picked the one you meant.
  • Size and colour. Adult apparel runs S to 5XL; 2XL–3XL are +$2 and 4XL–5XL are +$4.
  • Mug size. 11 oz or 15 oz, white ceramic or colour-inside.
  • Sign or print size. Metal roster sign 8×10, 11×14 or 16×20 in; square sign 12×12 in; prints 12×16 or 18×24 in, unframed.
  • The shipping address. Including the apartment or unit number, and the country.

On the product page, the roster check draws your typed names on the product as you type. It is a handy way to see how a list will sit, but the confirmation email is the record of what will actually be printed.

3. How to ask for a cancellation or a change

  1. Email us within 24 hours. Write to support@coopink.shop, or open a ticket. Put “Cancel” or “Change” and your order number in the subject line.
  2. Say exactly what you want. For a cancellation, say whether it is the whole order or one piece. For a change, give the new details in full.
  3. Write names as they should print. One name per line, top hen first, spelled exactly as you want them. We copy what you send, so a typo in your email becomes a typo on the mug.
  4. Wait for our confirmation. We reply within 24 hours on business days. The change or cancellation is done when you receive our confirmation email.

Your request counts from the time your email reaches us. If it arrives inside the 24 hours, it is inside the window, even if our reply comes later.

4. What can be changed

Changes you can ask for within 24 hours of ordering
Change What to send us Things to watch
Fix a hen’s name The correct spelling, and which line it is on Up to 12 letters per name
Reorder the roster The full list in the new order, top hen first Send the whole list, not just the swap
Add or remove a hen The full new list Tee and crewneck 8, hoodie back 10, mug 6, metal roster sign 10, paper roster print 12
Change the coop name The new coop name, exactly Up to 22 characters; 14 on a hat
Switch to “Coop name only” Which piece, and the coop name Available on every roster piece
Size or colour The new size or colour Size add-ons: 2XL–3XL +$2, 4XL–5XL +$4
Swap or add items The piece you want instead or as well We tell you any price difference first
Shipping address The full corrected address Metal coop signs ship to US addresses only

When a change moves the price

Some changes alter the total: going from a tee to a hoodie, moving from L to 3XL, adding a second mug. We email you the difference first. Nothing extra is charged unless you agree to it. If the new total is lower, the difference is refunded within 7 days of the change being confirmed.

Changing the address to another country

If you move an order from a US address to Canada, Australia or New Zealand, any metal coop sign in it cannot travel there. The Coop Door Roster Sign and the Coop Name Square Sign ship to US addresses only. We can swap the sign for the paper Flock Roster Print, which ships to all four countries and holds up to 12 hens, or cancel the sign and refund it. See Shipping & Delivery for the full picture.

5. Cancelling the whole order, or one piece

Within 24 hours of placing the order you can cancel all of it, or just one piece from it. If you cancel one piece, the rest of the order carries on as normal and ships as planned.

Say an order holds a roster hoodie, a little hen beanie and two 11 oz mugs, and you decide within the window that one mug is enough. Email us with the order number and “cancel one of the two mugs”. We confirm by email, the hoodie, the beanie and the remaining mug go ahead, and the price of the cancelled mug is refunded within 7 days of the cancellation. If you change your mind about the whole order instead, we cancel everything and refund the full amount on the same timing.

Refunds for cancellations

When we confirm a cancellation within the window, you get back the full amount you paid for what was cancelled. Shipping on every order is free, so there is no shipping charge to sort out. The refund is issued within 7 days of the cancellation, back to the payment method used for the order. How soon it then appears on your statement depends on your payment provider. Our Refund Policy explains the money side in more detail.

6. After the 24 hours have passed

Once the window closes, the order is in production or close to it, and we cannot promise to cancel or change it. If you write after 24 hours, we will look at the order and tell you honestly what is still possible. Most of the time the answer is to let the order arrive and use the return.

The return has your back

Every product can be returned within 60 days of delivery, including roster pieces and pieces with names spelled wrong. We pay the return postage and send a free label. Your refund is issued within 7 days of receiving the return, or you can ask for store credit, which never expires. The steps are on our Returns & Exchanges page.

Wrong address after the window

If you notice an address mistake after 24 hours, email us straight away anyway. We will tell you what can still be done. Once a parcel has shipped, delivery is in the hands of the carrier.

7. A few everyday situations

These are illustrations to show how the rules apply, not records of real orders.

A new pullet joined the flock this morning

Say you ordered a roster mug with five hens yesterday afternoon and a sixth girl came home today. If you email within 24 hours of ordering with the full list of six, one per line, top hen first, the mug can be changed. Six is the mug’s limit, so a seventh would need a different piece, such as the tee, the hoodie back or the paper Flock Roster Print.

The pecking order shifted

Hens have opinions, and the top hen is not always who you think. If Hazel has taken over from Clover, email us within the window with the whole list in the new order. Please do not just write “swap the first two”: send the full list exactly as it should print.

Two orders by accident

A double tap on a slow connection can create two identical orders. Email us within 24 hours with both order numbers and tell us which to cancel. The cancelled one is refunded in full within 7 days of the cancellation.

A gift that needs a quieter address

If you ordered a hoodie for a friend and want it to go to your house instead, so you can wrap it, send the new address within 24 hours. The order stays the same; only the shipping address changes.

8. What a clear change request looks like

The fastest requests are the ones we can act on without a second email. Here is the kind of message that works well:

  • Subject: Change, followed by your order number.
  • Piece: “The roster crewneck, size M.”
  • Change: “Please change the size to L and use this list instead.”
  • Coop name: “Maple Street Coop.”
  • Names, top hen first: Gladys, Peony, Nugget, Pepper, each on its own line.

Short, complete and spelled exactly as it should print. If anything in your request is unclear, we ask before changing anything, so nothing gets printed on a guess.

9. Set designs and plain changes

Not every change involves names. The drawn set designs, such as the chicken math tee, putting the girls to bed, the egg basket colours, the nest box “first egg” mug or the egg row trucker cap, carry no names at all. For these, the usual changes are a size, a colour, a swap for another design or a different quantity. The same 24-hour window and the same email steps apply. Hats and the enamel mug come in one size, so for those it is usually a swap or a cancellation.

10. Things we cannot change

  • Anything after the 24-hour window, unless we confirm by email that it is still possible.
  • Names beyond the limit for that piece, or longer than 12 letters.
  • A metal coop sign to an address outside the United States.
  • Delivery to a country outside the United States, Canada, Australia and New Zealand.

11. Questions about an order you just placed

Email support@coopink.shop with your order number. We reply within 24 hours on business days. Want to know where a shipped order is? Our Order Tracking page explains how tracking works. Coop Ink, 7936 Biscayne Point Circle, Miami Beach, FL 33141, US. Support is by email only.